CBAM indirect emissions: grid electricity factors, PPAs and evidence

Under CBAM, indirect emissions come from electricity only and count only for cement, fertilisers and sintered ore. Grid power uses the Commission's country factor; an actual factor needs a direct link or a physical PPA. Guarantees of origin do not count.

CBAM indirect emissions: grid electricity factors, PPAs and evidence

Under CBAM, indirect emissions are the emissions from producing the electricity consumed to make a good, and in the definitive period they are added to embedded emissions only for cement, fertilisers and sintered iron ore. They are not counted for iron and steel, aluminium or hydrogen. For grid electricity the rule is simple: use the country default factor published by the European Commission. An actual factor is allowed only where the installation has a direct technical link to the generator or a power purchase agreement (PPA) with physical delivery, and can prove it. Guarantees of origin, green certificates and virtual PPAs do not lower the factor.

This guide is based on the Commission's guidance on calculation methods (Guidance 3), the quick guide for non-EU operators (Guidance 2), the cement and fertiliser sector guidance (5A and 5C) and the default value tables as corrected by Regulation 2026/1740. We covered emission factor choice in general in our emission factors guide; here we focus only on the CBAM electricity rules, with notes for suppliers in Türkiye and the EU importers who buy from them.

What do indirect emissions cover under CBAM?

In CBAM legislation "indirect emissions" means electricity only. The Commission defines them as emissions from the production of electricity consumed during the production processes of goods, regardless of where that electricity was produced. Unlike Scope 2 in a corporate footprint, purchased heat, steam and cooling are not indirect emissions; under CBAM they count as direct emissions.

  • Direct emissions: fuel combustion, process emissions and the emissions from producing heat or cooling consumed at the installation, even if the heat comes from a neighbouring site.
  • Indirect emissions: electricity consumed (MWh) × emission factor of electricity (t CO₂/MWh).
  • Electricity generated on site: the fuel burnt in the power unit is a direct emission of the installation, but electricity generation is treated as a separate production process. Those emissions are not attributed to the CBAM good as direct emissions. For goods where indirect emissions count, they come in through the electricity the good consumes.

The emissions report shows direct and indirect embedded emissions separately; total embedded emissions are the sum of the two.

Which goods include indirect emissions?

The rule rests on two annexes of the CBAM Regulation: goods listed in Annex I but not in Annex II ("goods for which only direct emissions are taken into account") include indirect emissions.

SectorIndirect emissions counted?Note
Cement (clinker, cement, aluminous cement, calcined clay)YesElectricity of both kiln and grinding processes
Fertilisers (ammonia, nitric acid, urea, mixed fertilisers)YesIndirect emissions of separately produced hydrogen are not added to ammonia
Sintered iron oreYesCarried into steel products as a precursor
Iron and steelNoBut indirect emissions of sintered ore enter through the precursor
AluminiumNoThe large electricity use of electrolysis is not counted under CBAM
HydrogenNoListed in Annex II
Electricity (as a CBAM good)Separate rulesFactors for imported electricity are in Annex III of the default values regulation

The precursor rule works both ways. If the complex good is in Annex II (for example steel) but is made from a precursor outside Annex II (sintered ore), the precursor's indirect emissions are still included. If the complex good is outside Annex II (for example ammonia) but uses a precursor in Annex II (separately produced hydrogen), the precursor's indirect emissions are left out. Sector detail is in our guides on aluminium and cement, fertilisers and steel.

How is the calculation done?

The indirect emissions of a production process equal the electricity consumed in that process multiplied by the applicable emission factor. The guidance stresses three points on metering:

  1. Meter real power. Only the active power consumed by the installation is counted; the reactive component is disregarded.
  2. Losses sit outside the boundary. Transmission and distribution losses between the grid supply point and the installation boundary are ignored; only the installation's own consumption counts.
  3. Split electricity by process. Consumption of processes such as the clinker kiln and cement mill is separated with sub-meters. Where that is not possible, a justified allocation key such as operating time or output is used and written into the monitoring plan.

In the Commission's cement example (Guidance 5A) the clinker process consumes 81,575 MWh; at 0.626 t CO₂/MWh that gives 51,066 t CO₂ of indirect emissions. Grinding adds 0.085 MWh per tonne of cement. Of the 0.8771 t CO₂/t total embedded emissions of Portland cement, 0.0919 is indirect, roughly 10%. The factor in the example is Lebanon's default; the guidance points out that operators must use the value for the country where their installation is located.

Which emission factor applies?

The factor depends on where the electricity comes from. The guidance rules fit into one table:

Electricity sourceFactor to useCondition
GridCommission's country default (Annex II of the default values regulation, country average based on IEA data)No extra evidence
Installation's own generationFactor calculated from the installation's fuel mix; output from solar, wind and similar sources is added to the denominatorEvidence of a direct technical link (smart metering in particular)
Another directly connected installation (e.g. on-site CHP)That installation's factor, calculated with the same methods and verifiedEvidence of a direct technical link
PPA with a remote generatorThe generator's verified factorEvidence of a PPA with physical delivery
Virtual PPA, guarantees of origin (such as Türkiye's YEK-G), I-RECs, green certificatesNot acceptedThe grid default still applies

Where an installation receives electricity from several sources (for example grid plus rooftop solar), Article 9 of the methodology regulation requires a weighted average of the factors by share of consumption. If you can show the verifier that a given production process ran on a single source only, that source's factor may be used for that process.

What evidence is needed for an actual factor?

The two routes are alternatives; one is enough. In both cases the evidence list is fixed and the verifier will look for it.

Direct technical link:

  • A single line diagram confirming the link between the generator and the installation.
  • Smart metering data showing that electricity generated and consumed can be reconciled in measurement periods of one hour or less.
  • Where the link connects more than two installations, a contract covering at least the quantity consumed (or an intra-company offtake agreement if both belong to the same legal entity).

Power purchase agreement:

  • Written documentation from a public authority, the transmission system operator or another reliable public source confirming a physical grid connection between generator and installation.
  • Smart metering data reconciling generation and consumption in periods of one hour or less.
  • A single contract to which the installation, the generator and any intermediary are all parties, with physical delivery of electricity as its subject. Purely financial virtual PPAs fall outside this definition.

What this means for producers in Türkiye

A few common points of confusion:

  • National Scope 2 factors are not CBAM factors. The consumption-point factors published by Türkiye's Ministry of Energy and Natural Resources (for 2023: 0.436 t CO₂e/MWh at transmission and 0.469 at distribution level) are for corporate Scope 2 inventories. For CBAM grid electricity, the Commission's Annex II value for Türkiye applies. One plant may legitimately use two different factors in two reports.
  • YEK-G does not reduce the factor. The guidance does not allow market-based instruments such as guarantees of origin or green certificates to set a specific factor. A YEK-G certificate may help corporate reporting; it does not help under CBAM.
  • On-site solar can count. The guidance notes that electricity generated within your own installation can meet the direct technical link criteria, in particular the metering requirement. If you do not have a meter reading generation hourly or more often, install one first.
  • Read the electricity contract itself. Our view: not every supply contract is a PPA in the CBAM sense. Check whether the generator is a party, whether physical delivery is the subject of the contract and whether meter data reconcile, and decide together with your verifier.

The guidance also describes an alternative default factor: if a country shows with official data, averaged over the latest five years, that its grid factor is lower than the Commission's value, the Commission may set a modified default. The data must reach the Commission by 30 June of the year; if accepted, it applies from that year and is published as an amendment to the default values regulation. Check the latest table on the Commission's website before filling in your annual report.

How large is the indirect share? Türkiye default values

The Commission's corrected default value tables show direct and indirect components separately. Selected rows for Türkiye (per tonne of good, excluding mark-up; for grey clinker and grey Portland cement, which have no Türkiye value, the "other countries" row applies):

ProductCNDirectIndirectTotal
Grey clinker (other countries)2523 10 00 901.3700.0501.410
Grey Portland cement (other countries)2523 29 001.3600.0801.440
Aluminous cement2523 30 001.8200.1401.950
Anhydrous ammonia2814 10 002.1700.1002.270
Urea (>45% N, solid)3102 10 191.4400.0801.510
Ammonium nitrate3102 30 902.5300.0702.600
Sintered iron ore2601 12 000.1800.0300.210

Totals are as rounded by the Commission. On these figures the indirect share is roughly 3% to 7% of the total for cement and fertilisers and about 14% for sintered ore (our calculation). Our view: small, but not negligible. Default-value declarations for cement carry a 10% mark-up in 2026 and 20% in 2027, while actual-data declarations calculate indirect emissions from your own consumption. Efficient grinding and proper sub-metering feed straight into the number of certificates. See our CBAM certificate cost guide for the certificate calculation.

What cement and fertiliser producers should do now

  1. Split electricity consumption from the main incoming meter down to production processes; if sub-meters are missing, document the allocation key.
  2. List your electricity sources: grid, on-site solar or CHP, any direct contract with a generator.
  3. For on-site generation, keep hourly (or finer) meter data and an up-to-date single line diagram.
  4. If you planned to lower the factor with YEK-G or a virtual PPA, assume it will not count under CBAM.
  5. With more than one source, add the weighted-average factor calculation to the monitoring plan.
  6. Agree the evidence file and factor choice with your verifier at the start of the period. The full reporting sequence is in our CBAM report guide.

Where Carbonet fits

Carbonet is a carbon footprint and CBAM software developed by LNA Soft in Izmir, Türkiye. Fuel, electricity and process data entered for the carbon footprint flow into the CBAM calculation, so nothing is entered twice. The CBAM module calculates embedded emissions per product with direct and indirect parts shown separately; indirect emissions are added for cement and fertilisers using the EU method and left out for steel and aluminium. Details are on our CBAM embedded emissions calculation page; EU importers sourcing from Türkiye can also see CBAM Turkey.

Conclusion

Indirect emissions under CBAM follow three rules: only electricity counts, only cement, fertilisers and sintered ore include them, and grid electricity uses the Commission's country factor. The route to an actual factor is not buying certificates but proving a physical connection with hourly meter data. Producers who start collecting that evidence now will not lose time when verification begins.

To connect your plant's electricity data to the CBAM calculation, request a demo, write to info@carbonet.com.tr or reach us on WhatsApp: +90 533 368 05 99.

Frequently asked questions

Which goods include indirect emissions under CBAM?

In the definitive period, goods listed in Annex I but not Annex II of the CBAM Regulation: cement, fertilisers and sintered iron ore. Indirect emissions are not added for iron and steel, aluminium or hydrogen, although the indirect emissions of sintered ore used in steelmaking are carried into steel products as a precursor.

Is purchased steam or heat an indirect emission under CBAM?

No. Under CBAM, indirect emissions are only the emissions from producing the electricity consumed. Emissions from producing heat or cooling consumed at the installation count as direct emissions, even when the heat comes from another installation.

Which factor is used for grid electricity?

The country average factor based on IEA data, published by the European Commission in Annex II of the default values regulation (2025/2621). National Scope 2 factors, such as those published by Türkiye's Ministry of Energy, are not used for CBAM.

Can guarantees of origin or green certificates lower the CBAM electricity factor?

No. The Commission's guidance does not allow market-based instruments such as guarantees of origin or green certificates to set a specific factor. An actual factor can only be used where a direct technical link or a PPA with physical delivery is proven.

What is needed to use an actual factor through a PPA?

Official documentation of a physical grid connection between generator and installation, smart metering data reconciling generation and consumption in periods of one hour or less, and a single contract for physical delivery signed by the installation, the generator and any intermediary. Virtual PPAs do not qualify.

What if a plant uses both grid power and its own solar plant?

Article 9 of the methodology regulation requires a weighted average of the factors by share of consumption. If the verifier accepts evidence that a production process ran on a single source only, that source's factor may be used for that process.