A 90-day CBAM implementation plan for non-EU producers: inventory and internal calculation, English monitoring plan, precursor data requests, O3CI, choosing an EU-accredited verifier, and what EU importers should ask suppliers now.

A CBAM implementation plan for a non-EU producer starting today breaks the first 90 days into three blocks: days 1–30 to map goods, installations and data and run an unverified internal calculation per product; days 31–60 to draft the English monitoring plan and send precursor data requests; days 61–90 to contract an EU-accredited verifier and fix the date of the first site visit. A 90-day window starting on 23 November 2026 covers January 2027, when the first CBAM verification reports can be issued, and February 2027, when declarants can start buying CBAM certificates. For producers in Türkiye it also covers the 27 January 2027 deadline for the first Turkish ETS monitoring methodology plan.
This guide is based on the European Commission's Guidance No. 2 for non-EU operators, the Commission's guidance on CBAM verification and accreditation (24 August 2026), the Commission's state-of-play table on CBAM accreditation dated 13 November 2026, and the 14 October 2026 notice of Türkiye's Climate Change Directorate. For the basics, start with what CBAM is.
Why now: the calendar ahead
The definitive period started on 1 January 2026. For goods imported in 2026, the reporting period is the 2026 calendar year unless the actual time of production can be evidenced. In practice, your EU customer's first annual declaration in 2027 rests on your 2026 data.
| Date | What happens | Source |
|---|---|---|
| September 2026 | Accredited verifiers can register in the CBAM Registry; first verifications (document review, site visit) begin | Commission verification page |
| January 2027 | First verification reports can be issued; operators can share them with declarants | Commission verification page |
| 27 January 2027 | Extended deadline for the first Turkish ETS monitoring methodology plan of pilot-phase installations | Climate Change Directorate notice, 14 Oct 2026 |
| February 2027 | Declarants can start purchasing CBAM certificates | Commission verification page |
| 30 September 2027 | First annual CBAM declaration and surrender of certificates for 2026 imports | Commission news page |
Verifier capacity is tight. According to the Commission's table of 13 November 2026, 24 national accreditation bodies in the EU/EEA have agreed to provide CBAM accreditation, 20 are ready to accept applications, and only 7 accept applications from verifiers established outside the EU. The Commission page says the list of accredited CBAM verifiers "will be published"; at the time of writing it was not yet there. Guidance No. 2 itself advises operators to look for a verifier early in the reporting period to avoid bottlenecks.
Days 1–30: inventory and an internal calculation
The first month is about knowing exactly what you sell to the EU and what data you already hold.
- Goods and customers: the 8-digit CN code of every product shipped to the EU, the buyer and the 2026 quantity. The 50-tonne threshold applies to the importer; data requests can reach you regardless of the volume you ship.
- Installation boundaries and production processes: this is step 1 in Guidance No. 2. Goods with the same functional unit form one production process; fuel or intermediate flows between processes may need to be monitored as well.
- Precursor list: CBAM goods you buy in (billets, flat steel, clinker, ammonia, unwrought aluminium…), their country of origin and supplier. There is no threshold for omitting small amounts of precursors.
- Data inventory: monthly fuel, electricity, raw material and production records for 2026, the list of meters and weighbridges, and the gaps. See our guide on collecting data from invoices, meters and fuel records.
- Unverified internal calculation: calculate specific direct (and, where relevant, indirect) embedded emissions per product once and compare them with the Commission's default value for your country. This number cannot be declared, but it shows where actual data is worth the effort. For the decision criteria, read default values vs actual data.
By day 30 you should have a one-page decision note: which goods go with actual data and which with default values, who is responsible, and which data is missing.
Days 31–60: monitoring plan and data requests
The monitoring plan is the written "recipe book" for calculating embedded emissions. Under Guidance No. 2 it must contain at least the elements in section A.5 of Annex II to the Methodology Regulation (EU) 2025/2547, it must be made available to the verifier in English, and a local-language version should exist for the staff who apply it. It has to be clear enough for an independent person with some knowledge of GHG monitoring to understand the method.
| What the plan must cover | In practice |
|---|---|
| Reporting period | Calendar year (1 January–31 December) |
| Direct emissions method | Calculation-based (fuel quantity × factor) or continuous measurement; special rules for N2O from nitric acid and PFC from primary aluminium |
| Measurable heat | Attribution of steam and hot-water flows to production processes |
| Indirect emissions | Only for cement, fertilisers and sintered ore; electricity consumption per process |
| Precursors | Quantity used per process and supplier data or default values |
| Qualifying parameters | Clinker content, forms of nitrogen, scrap share and other Annex IV point 2 data |
| Free allocation and carbon price | Data for the benchmark; information on any carbon price paid at home |
| Control system | Risk assessment, four-eyes review, cross-checks against a second source, calibration schedule |
Three more tasks run in parallel:
- Precursor data requests: if you want actual data for purchased precursors, ask for the producing installation, specific embedded emissions, qualifying parameters and a valid, positive verification report. Our CBAM supplier data checklist works in this direction too.
- O3CI registration: registration in the CBAM Registry module for non-EU operators is currently voluntary but recommended by the Commission. You upload data once per installation and declarants see only the summary.
- Turkish ETS: installations covered by the pilot phase (electricity, cement, iron and steel, aluminium, fertilisers) must submit their first monitoring methodology plan by 27 January 2027. The rules and templates differ from CBAM, but fuel, metering and control information largely comes from the same records. More in our Turkish ETS guide.
Days 61–90: choosing a verifier
Actual data replaces default values only if it is verified by a verifier accredited by a national accreditation body in the EU, with an accreditation covering your sector and valid when the final verification report is issued.
In the Commission's 13 November 2026 table, the 7 bodies accepting applications from verifiers outside the EU are France (COFRAC), Greece (ESYD), Italy (Accredia), the Netherlands (RvA), Poland (PCA), Slovakia (SNAS) and Sweden (Swedac). The table notes an agreement between RvA and Türkiye's TÜRKAK, and between Swedac and the accreditation bodies of Ukraine, the UK and India; ask your candidate verifier what this means in practice for you.
Questions to ask a verifier:
- Which body accredited you for CBAM, for which sectors, and are you registered in the CBAM Registry?
- When will the site visit take place? Under the verification guidance, the first year requires a physical site visit; a virtual visit is possible only if a physical visit took place in the preceding reporting period and the other conditions are met.
- What is the target date for the final report? You need to share it before your customer's 30 September 2027 declaration.
- Conflict of interest: an organisation that prepared your monitoring plan or emissions report, or one linked to it, cannot verify the same installation. Keep your consultant and your verifier separate from the start; see our note on consultant vs software tasks.
What you should have on day 90
| Deliverable | For whom |
|---|---|
| List of goods, CN codes and buyers; actual data vs default value decision | Management, sales |
| Unverified internal calculation per product compared with default values | Management, pricing |
| Draft monitoring plan in English and the local language, with control procedures | Verifier, plant staff |
| Data requests sent to precursor suppliers and a tracker for replies | Purchasing |
| O3CI registration (recommended) | EU customers |
| Signed verification contract and site visit date | Timeline to share with customers |
| Turkish ETS monitoring methodology plan, if in the pilot scope | Climate Change Directorate |
For a printable one-page version, use our CBAM and Turkish ETS readiness checklist.
If you are an EU importer
The same calendar applies to you from the other side. Ask each non-EU supplier, before the end of 2026, three things: whether they will use actual data or default values for 2026, which verifier they have contracted and when the site visit is planned, and whether they are registered in O3CI. Suppliers without a verifier by early 2027 are the ones most likely to leave you with default values and the 2026 mark-up of 10% (1% for fertilisers).
Common mistakes
- Treating a corporate carbon footprint as CBAM data: a company-wide scope 1 and 2 total is not embedded emissions per product.
- Leaving the verifier until September 2027: that is your customer's deadline, not yours.
- Writing the monitoring plan only in English: if the staff reading meters cannot follow it, the verifier will find gaps.
- Forgetting precursors: without data for purchased billets or clinker, default values fill that part.
- Asking the verifier to write the monitoring plan: conflict-of-interest rules do not allow it.
Where Carbonet fits in these 90 days
Carbonet is a carbon management platform developed by LNA Soft in Izmir, Türkiye. In its CBAM module you define installations, goods and CN codes (all 569 CN codes of the EU goods list are built in), add production processes and purchased precursors, and get direct and indirect embedded emissions per product calculated with the EU method. Fuel, electricity and process data entered for the carbon footprint flows into the CBAM calculation, and screens and reports are in English and Turkish. That lets you run the day-30 internal calculation and the data set for your verifier from one place. Writing the monitoring plan and carrying out the verification remain the job of your team, your consultant and your verifier, not of software.
To walk through a 90-day plan with your own products, use the demo request form or write to info@carbonet.com.tr, or on WhatsApp at +90 533 368 05 99.
Frequently asked questions
Where should a non-EU producer start with CBAM?
List the CN codes, EU buyers and 2026 quantities of every product shipped to the EU, define installation boundaries, production processes and purchased precursors, then run an unverified internal calculation per product and compare it with the Commission's default value for your country.
In which language must the CBAM monitoring plan be written?
Under the Commission's Guidance No. 2, the monitoring plan must be made available to the verifier in English. A local-language version for the plant staff who apply it is recommended.
Who can verify CBAM emissions data?
Only a verifier accredited for CBAM by a national accreditation body in the EU, with an accreditation covering your sector and valid when the final report is issued. In the Commission's 13 November 2026 table, 7 accreditation bodies accept applications from verifiers outside the EU.
Is a site visit required in the first CBAM verification?
Yes. According to the Commission's verification guidance, a virtual site visit is only possible if a physical visit took place in the preceding reporting period and other conditions are met, so a physical visit should be expected in the first year.
Can our CBAM consultant also be our verifier?
No. An organisation that prepared your monitoring plan or emissions report, or one linked to it, cannot verify the same installation. Choose them separately from the start.
What should EU importers ask their suppliers now?
Whether they will use actual data or default values for 2026, which accredited verifier they have contracted and when the site visit is planned, and whether they are registered in the O3CI portal of the CBAM Registry.