CBAM electricity imports: Türkiye's 0.718 default and five conditions

How electricity imported from Türkiye is declared under CBAM: the 0.718 t CO₂/MWh default, why it differs from the 0.420 grid factor, the five conditions for actual emissions, a 100,000 MWh cost example and the Commission's proposal.

CBAM electricity imports: Türkiye's 0.718 default and five conditions

Electricity imported into the EU has been a CBAM good since 1 January 2026: the authorised CBAM declarant reports the embedded emissions of every megawatt-hour and surrenders certificates for them, and unless all five conditions for actual values are met, the country default applies, which for Türkiye is 0.718 t CO₂/MWh. That figure is far higher than the Turkish grid factor used for indirect emissions of industrial goods (0.420), because it reflects only fossil-fuelled generation. This guide explains who declares what, where the default comes from, the five conditions for using a power plant's actual emissions, what a 100,000 MWh import costs, and what the Commission's December 2025 proposal would change.

It is written for EU electricity traders and importers buying from Türkiye and the Western Balkans, and for the Turkish generators and trading companies selling to them. Sources: CBAM Regulation (EU) 2023/956 as amended by Regulation (EU) 2025/2083, Implementing Regulation (EU) 2025/2621 on default values (Annexes II and III), the Commission's Guidance 5F on electricity (14 August 2026), Guidance 4 on the free allocation adjustment, and proposal COM(2025) 989. For the wider picture, start with our CBAM guide.

Why electricity is a separate CBAM good

CBAM covers six sectors: cement, iron and steel, aluminium, fertilisers, hydrogen and electricity. Electricity shows up in two different roles, and they are often confused:

  • Electricity as a good: power generated outside the EU and imported across an interconnector (CN code 2716 00 00). The importer declares the electricity itself.
  • Electricity as indirect emissions: the emissions of power consumed when producing cement, fertilisers or sintered ore. The declared good is the cement or fertiliser; electricity is only an input to the calculation. We cover this in our guide to CBAM indirect emissions.

Electricity as a good is listed in Annex II to the CBAM Regulation, so only direct emissions count: the CO₂ from fuel combustion at the power plant. Guidance 5F stresses a second difference. For other goods, monitoring actual emissions is the rule and default values are the fallback. For electricity it is the other way round: the default value is the normal route, and actual emissions may be used only if all five conditions are met.

Who declares, and what is the exporter's role?

The declaration is made by the authorised CBAM declarant in the EU: the company importing the electricity or its indirect customs representative. The 50-tonne de minimis threshold applies only to cement, iron and steel, aluminium and fertilisers. There is no threshold for electricity or hydrogen, so every electricity importer needs authorised declarant status.

A Turkish generator or trader has no CBAM filing obligation of its own, but it is affected in two ways:

  1. Price: the EU buyer prices the certificate cost into every megawatt-hour. With the default value, that cost sets the competitiveness of Turkish power on the EU market.
  2. Actual data: if the buyer wants to use the plant's actual emissions instead of the default, the plant must supply a verified emissions report and evidence for each condition.

The first annual declaration, covering 2026 imports, is due on 30 September 2027. The free allocation adjustment for electricity is zero: according to Guidance 4, EU electricity generators receive no free allocation under the EU ETS, so there is nothing to deduct for imported electricity either. All embedded emissions are covered by certificates.

The default value: 0.718 t CO₂/MWh for Türkiye

Embedded emissions of imported electricity are a single multiplication: electricity imported (MWh) × emission factor (t CO₂/MWh). The factor is chosen in this order:

  1. The country value in Annex III to Implementing Regulation 2025/2621. For Türkiye: 0.718 t CO₂/MWh.
  2. Where no country value exists, the EU value: 0.612 t CO₂/MWh.
  3. An alternative default, if a third country proves with reliable official data that its factor is lower. The government submits the data by 30 June of the year concerned; if the Commission accepts it, the regulation is updated, where feasible, by 30 June of the following year.
  4. The plant's actual emissions, if all five conditions are met.

Annex III values are based on International Energy Agency data and, according to the regulation's recitals, are averages of the most recent five years, which smooths out anomalous years such as droughts. Correcting Regulation 2026/1740 replaced only Annexes I and IV, so the electricity values are unchanged. Unlike other goods, electricity defaults carry no phased mark-up (10/20/30%). Selected Annex III values:

CountryAnnex III factor (t CO₂/MWh)
Türkiye0.718
Georgia0.440
Serbia1.041
North Macedonia0.887
Ukraine0.907
United Kingdom0.430
EU (fallback)0.612

One country, three factors: which one applies where?

A common mistake is to take a factor published for one purpose and use it in another calculation. For Türkiye there are at least three official values, each with a different definition:

ValueSourceWhat it measuresWhere it is used
0.718 t CO₂/MWh2025/2621 Annex IIICO₂ intensity of fossil-fuelled generation onlyCBAM declaration of electricity imported from Türkiye
0.420 t CO₂e/MWh2025/2621 Annex IIGrid average, renewables includedCBAM indirect emissions of cement, fertilisers and sintered ore made in Türkiye
0.469 t CO₂e/MWh (2023, distribution)Turkish Ministry of Energy and Natural ResourcesConsumer-side grid factorLocation-based scope 2 in a corporate carbon footprint

The reason 0.718 is so high is the definition. For electricity imports, the CBAM Regulation defines the "CO₂ emission factor" as the CO₂ emissions of the power sector divided by gross electricity generation from fossil fuels. Hydro, wind and solar do not enter the denominator. The Annex II value of 0.420, by contrast, is a grid average across all sources. For scope 2 factor choices, see our emission factors guide.

Worked example: what does 100,000 MWh cost?

Assume an EU trading company imports 100,000 MWh from Türkiye in 2026. For the certificate price we use the 2026 third-quarter price of €82.32 as an illustration; the actual price depends on the period of import.

CaseFactor (t CO₂/MWh)Embedded emissions (t CO₂)Certificate costPer MWh
Default value (Türkiye)0.71871,800≈ €5.91 million≈ €59.1
Gas combined cycle, actual data (assumed 0.37)0.3737,000≈ €3.05 million≈ €30.5
Wind farm, actual data0000
Coal plant (actual ≈ 0.99, above the 550 g limit)0.718 (default)71,800≈ €5.91 million≈ €59.1

Two conclusions follow. First, at this price the default value adds roughly €59 per MWh, enough on its own to decide whether a cross-border trade is profitable. Second, the actual-data route is open only to low-emission plants: a plant emitting more than 550 grams of fossil CO₂ per kWh cannot use its actual value. In the guidance example, a coal block comes out at 0.988 t CO₂/MWh; power from such a plant is declared at the default.

A carbon price paid under the Turkish ETS may be deductible in future, but 2026 is a monitoring and reporting year in the Turkish pilot phase, and free allocation for 2027 is 100%. Our reading is that importers should not expect a deduction for Turkish ETS costs on 2026 electricity imports. See our Turkish ETS guide and our article on how the CBAM certificate price is set.

The five conditions for declaring actual emissions

Under point 5 of Annex IV to the CBAM Regulation, an importer may use a plant's actual emissions only if all five conditions are met. Guidance 5F lists the evidence for each:

ConditionEvidence required
(a) A power purchase agreement (PPA) for physical delivery between the declarant and the third-country producerThe PPA must be in force at the time of import and cover at least the declared quantity. If concluded through an intermediary, one single contract between the three parties.
(b) The plant is directly connected to the EU transmission system, or there was no physical congestion anywhere between the plant and the EU system at the time of exportA single line diagram showing the direct connection, or written documentation from the TSO (or another informed entity) showing no congestion, on an hourly basis.
(c) The plant emits no more than 550 g of fossil CO₂ per kWhData showing the plant's emission intensity (its verified emissions report).
(d) The quantity was firmly nominated to allocated interconnection capacity by all responsible TSOs in the countries of origin, destination and any transit, with nomination and production in the same period of at most one hourWritten documentation from the nominating party or the TSO, plus smart meter data matching production to the nomination period.
(e) An accredited verifier certifies that the conditions are metAt least monthly interim reports to the verifier.

The evidence goes to the plant's verifier. The plant's emissions report then carries a "declarant-specific addendum" for each importer: the declarant's EORI number, a statement that the conditions are met and the evidence was submitted to the verifier, and the quantity that declarant imported from the plant. If the plant has several units, its factor is the production-weighted average; in a combined heat and power unit, emissions are first split between heat and electricity. In the guidance example, a coal block (0.988) and a gas CHP block (0.302) together give 0.545 t CO₂/MWh, which also serves as proof of the 550 g condition.

In practice, conditions (b) and (d) are the hardest. Hourly congestion evidence and hour-by-hour matching of nominations with meter data require regular documentation from the TSOs (in Türkiye, TEİAŞ) and from the buyer. The Commission itself admitted in its 2025 proposal that these conditions "have proven very difficult to meet in practice".

What the Commission's proposal would change (not yet law)

On 17 December 2025 the Commission published proposal COM(2025) 989 amending the CBAM Regulation. Its electricity provisions include:

  • New factor definition: defaults for imported electricity would be based on the average grid emission factor from all sources, not fossil generation only. The Commission would calculate and publish revised values.
  • Congestion condition removed: condition (b), together with the direct-connection alternative, would be deleted.
  • PPAs via intermediaries: accepted where a verifiable contractual chain between producer, intermediaries and importer can be shown.
  • Retroactive application: the new factor method and conditions would apply to electricity imported from 1 January 2026, so that the first declaration on 30 September 2027 can use them.

The 550 g condition and the hourly nomination condition remain in the proposal. Status: the European Parliament adopted its position on 15 September 2026 and referred the file back for interinstitutional negotiations; as of 21 November 2026 there is no final text. Guidance 5F states explicitly that it does not reflect the proposal because the legislative process is ongoing. Today's rules are therefore 0.718 and the five conditions. Do not assume the Annex II value of 0.420 will become the new electricity default; the Commission will set the method and data for any new value separately.

Checklist for EU importers and Turkish sellers

  1. Price the default in: in every offer, compute the CBAM cost per MWh (0.718 × certificate price) and agree in the contract who bears it.
  2. Screen the plant: is its fossil CO₂ intensity below 550 g/kWh? If not, the actual-data route is closed.
  3. Build the evidence chain now: if you aim for actual values, keep hourly meter data, nomination records and the PPA in one file, in a monthly interim report rhythm. Verification of 2026 data takes place in early 2027, and documents are hard to reconstruct afterwards.
  4. Appoint the verifier early: the verifier must be accredited in the EU and receive the monthly interim reports. A body that advised on the plant's monitoring cannot verify the same installation.
  5. Track the proposal: if adopted, it applies retroactively to 2026 imports and may change both the default and the conditions.

Where Carbonet fits

Carbonet is a carbon footprint and CBAM software developed by LNA Soft in Izmir, Türkiye. Its CBAM module covers all six sectors, including electricity; installation data, emission sources, the energy balance and the combined heat and power calculation are on screen, and fuel and electricity data entered for the carbon footprint flow into the CBAM calculation without being typed twice. For industrial exporters the key point is using the right factor in the right calculation: CBAM indirect emissions, scope 2 and electricity imports each use different factors, and Carbonet stores the factor source with every calculation. See the calculation steps on our CBAM embedded emissions page or our CBAM for Türkiye page.

Conclusion

Electricity is the only CBAM good where the default value is the rule and actual data the exception. For Türkiye, 0.718 t CO₂/MWh means tens of euros per megawatt-hour at current certificate prices, and that cost feeds straight into what an EU buyer will pay for Turkish power. Low-emission plants can cut it by documenting all five conditions; coal plants cannot. The Commission's proposal would ease the conditions, but it is not law yet.

To set up CBAM data and the right emission factor choices for your supply chain, request a demo, write to info@carbonet.com.tr or reach us on WhatsApp: +90 533 368 05 99.

Frequently asked questions

Is electricity imported from Türkiye covered by CBAM?

Yes. Electricity (CN 2716 00 00) is one of the six CBAM sectors, and the definitive period began on 1 January 2026. The authorised CBAM declarant in the EU files the declaration and surrenders certificates; the first annual declaration for 2026 imports is due on 30 September 2027.

What is the CBAM default value for electricity from Türkiye?

0.718 t CO₂/MWh, from Annex III to Implementing Regulation 2025/2621. It is based on IEA data, reflects the CO₂ intensity of fossil-fuelled generation only and is a five-year average. No phased mark-up applies to electricity.

Is 0.718 also used for indirect emissions of cement and fertilisers?

No. Indirect emissions use the grid average in Annex II of the same regulation, which is 0.420 t CO₂e/MWh for Türkiye. Corporate scope 2 reporting uses the Turkish Ministry of Energy's own grid factors.

Does the 50-tonne de minimis threshold apply to electricity?

No. The 50-tonne threshold covers only cement, iron and steel, aluminium and fertilisers. There is no threshold for electricity or hydrogen, so every electricity importer needs authorised CBAM declarant status.

When can a power plant's actual emissions be used?

Only if all five conditions are met: a physical-delivery PPA with the declarant, direct connection or no congestion, at most 550 g of fossil CO₂ per kWh, firm capacity nomination matched within one hour, and an accredited verifier certifying this through monthly interim reports.

What would the Commission's proposal change?

Under COM(2025) 989, defaults would switch to an all-source grid average, the congestion condition would be removed and PPAs via intermediaries accepted, applying to imports from 1 January 2026. As of 21 November 2026 the proposal is still in negotiation and not law.